Combined Cycled Thermoelectric Power Plants

In recent decades these power plants have undergone significant growth worldwide. INITEC Energía has actively participated in this evolution, acquiring extensive experience in this field. The facilities within which our company has undertaken its activity add up to total power of close to 9000 MW. This participation covers everything from Property engineering to the “turnkey” provision of facilities, as well as viability studies, execution of reforms and improvements to existing facilities, passing through design phases, detail engineering, management of materials and sub-contracts, supervision of construction, tests, start-up and support for exploitation.

San Lorenzo Combined Cycle Power Plant (CCPP)

  • Situation: México
  • Type: Conversion of Open Cycle to Combined Cycle
  • Client: CFE (Comisión Federal de la Energía)
  • Power: 455 MW (2x2x1)
  • Construction in "turnkey" modality (EPC) in conjunction with Dragados Industrial of the cycle closure of two gas turbines in “multi-shaft” configuration, using two recovery boilers and a steam turbine, generating total power of 455 MW.